|
Brewing System |
Large Brewery 1600L (10brl system) |
|
Click on Links for Photographs or more information (details are for general guidance only, not a specification) |
|
|
Vessel Size |
10 barrels, 1600 to 2000 litres |
|
Approx Brewlength |
1600 litres to 1800 litres per batch dependent on ABV (about 40 or so Firkins per batch) |
|
Approx Alcohol By Volume |
2.5% to 6.0% |
|
Brews per Week |
Two as standard (3000 litres to 3600 litres), more possible with purchase of additional FV's |
|
Material of Construction |
Stainless Steel Vessels, heat exchanger, product pipework, food grade seals |
|
Five; Hot Liquor Tank, Mash Vessel, Combined Copper/Hopback, 2 Fermentation Vessels, plus pump/pipe/Hx unit and chiller (can ship on 6 pallets, or container) |
|
|
Hot Liquor Tank |
Yes, 3KW to counter heat loss, Hot water made in Copper / Brew Kettle |
|
Malt Mill |
None, uses pre-crushed Malt |
|
one, upto 250 kg grist, rotating sparge arms |
|
|
Copper / Brew Kettle |
one, 36 KW |
|
Heat Exchanger |
one plate heat exchanger |
|
Two interchangeable; one stainless steel hygienic wort/beer/CIP pump, identical hot liquor/sparge pump |
|
|
Hygiene |
Integrated Cleaning In Place (CIP) at 80 degrees celsius (cleaning and equipment pasteurisation) |
|
Stainless steel 22mm diameter, food grade CIP return /racking hose |
|
|
Fittings |
RJT Hygenic standard |
|
Valves |
Sanitary Hygenic Butterfly valves for product |
|
Hygenic Welds |
ground smooth internally (where necessary) |
|
Two Hygenic Stainless Steel FV's as standard, with yeast separation device. More can be added to upgrade capacity. |
|
|
Refrigeration |
one unit to chill FV's |
|
Manual |
Supplied, see separate home page link for details |
|
Recipe Formulation |
Standard recipes and Guidance given |
|
Brewing Tables |
Dip tables, ABV table, Saccharometer correction Table |
|
Standard Finish |
Silver Utility, (insulation equivalent to 55mm polystyrene to shell) |
|
Brew Day |
About 8 to 10 hours |
|
Fermentation Cycle |
7 days is typical at 20 to 25 degrees celcius |
|
Upgradeable |
Yes, by purchase of additional Fermentation Vessels |
|
Power requirement |
Electricity, 415/220v ac, three phase (see modifications for other options), Gas |
|
Beer Colours |
All standard types, including, pale, light, dark, black and red beers |
|
Standard Carbohydrate Sources |
Barley Malt, Ale Malt, Lager Malt, Coloured Malts, Wheat, Oats, Maize Grits, Brewing Sugars |
|
Hops |
All Varieties as whole hops or Type 100 pellets (whirlpool modification needed for type 90 pellets) |
|
Typical Beer Types |
Cask Beers, Real Ales, Bottle Conditioned Ales (BCA) |
|
Filtration |
None, optional Purchase for filtered beers |
|
Maturation |
Typically matured in cask or bottle in |
|
Optional Modifications |
Alternative power eg 110vac 3
phase (eg |
|
Water requirement |
22mm mains water, flow rate greater than 25 litres per minute, temperature less than 15 degree celsius, or purchase cold water storage tanks and booster pump |
|
Lead Time |
12 to 16 Weeks approx, (can sometimes lend smaller unit for training purposes) |
|
Number Built (upto 2006) |
4 |
|
Ship to |
|
|
Price |
Request "Microbrewery FAQ.doc" by email |
|
Delivery |
At Cost, usually hired vehicle to |
|
Can be self installed, or optional cost service |
|
|
Training |
optional 2 weeks on site recommended, alternative use manual and 3 day moonstone course |
|
Maintenance |
Designed for low and self maintenance |
|
Ongoing Support |
Master Brewer and MBA, usually by Fax and Email subject to terms of business |